Non-oriented silicon steel is the core material of the rotor of motor and generator working in rotating magnetic field, which requires good magnetic properties and technological properties. In recent years, with the development of high speed and miniaturization of motors, higher requirements have been put forward for the performance of non-oriented silicon steel, such as low iron loss and high magnetic sensitivity at high frequency.
Product Description:
| Brand Name | GNEE | ||
| Product Name | CRNGO Best Price Electrical Steel Lamination Iron Core | ||
| Standard | AISI, ASTM, BS, DIN, GB, JIS,etc. | ||
| Nominal Thickness | 0.35mm,0.50mm,0.65mm | ||
| Nominal Width | 50mm~1250mm | ||
| Length | Any Length Based on Coil Weight or by Required | ||
| Coil Inner Diameter | 508mm | ||
| Surface treatment | Inorganic coating | ||
| Semi-organic Coating | |||
| Grade | B35A300, B50A470, B50A600, B50A800, B50A1000,B50A1300, | ||
| B65A800,etc. | |||
| Delivery Lead Time | 15~30 days after T/T prepayment or L/C date | ||
| Price Term | FOB,CIF,CFR,EX Works, FCA, DDU | ||
| Port of Loading | China Port | ||
| Payment | L/C at Sight | ||
| T/T 30% in Advance,70% Balance against B/L Copy | |||
| Supply Ability | 200,000 MT per Year | ||
| MOQ | 25 Metric Tons | ||
| Packing | Mill's Standard Export Sea-worthy Packing | ||
| Application | Suitable for motors and generators manufacturing of Direct motor, AC motor,small household appliances, air conditioner compressor,refrigerator ,Air compressor, pneumatic pump |
||


FAQ:
Q1: How to ensure delivery time?
If the goods are not delivered according to PI's requirements, we can pay the penalty.
Q2: How to ensure quality?
Customers can check the quality before leaving the factory, and our workers will also go to the factory to check the quality.
Q3: Do you have quality control?
Yes, we have been certified by BV and SGS.
Q4: Can you arrange shipment?
Of course, we have regular freight forwarders who can get the best prices from most shipping companies and provide professional services.
Q5: What is your lead time?
Usually 7-14 days if it is available. Or 25 to 45 days if there is no stock, by quantity.
maq per Qat: non-oriented electrical silicon steel, China, suppliers, manufacturers, factory, buy, price, pricelist, for sale, in stock, free sample

